Kronospan Project
- A 165,000 square foot industrial manufacturing facility for
producing hardwood flooring and laminate products. The site,
built in two phases, consists of a press and finishing
facility, powerhouse, warehouse, and other remote facilities.
Acker Electric was selected as the electrical subcontractor
for the facility, self performing all electrical
installations. A design-build project, this fast paced,
complex job was completed in 10 months time.